微信扫码分享
多伦多滨水区改造项目之一The future Villiers Island


The future Villiers Island, image courtesy of Waterfront TorontoThe south and east shores of the future island remain connected to land for now, as crews work away on the new river channel. This new channel will augment the flow capacity of the existing outlet: the river currently makes a sudden right-angle turn into the artificial Keating Channel, which requires regular dredging to maintain its flow.

Shape of new river valley emerging, image by Forum contributor skycandyTo create new parkland alongside Toronto Harbour, Waterfront Toronto has been undertaking the Cherry Street Lakefilling project. It commenced in winter 2017 and has now wrapped up. An element of the Port Lands Flood Protection Project, the lakefilling process formed new land around Essroc Quay, replacing its hard edges with a more natural shoreline for the northwest corner of Villiers Island. (Essroc manufactures cement, and will be moving its operations eventually.)The lake filling work is best summarized in a brief time-lapse video released by Waterfront Toronto last month.Certain elements of Villiers Island shown in pre-construction renderings and models are now starting to materialize. One area known as the 'fish cove' is located at the west end of the island, and is protected bay divided from the lake by a fish gate, and traversed by a pedestrian bridge. This and some other features have been designed to bring wildlife back to the mouth of the Don, looking to undo decades of industrial damage to the area.